BuildTotals

Project ticket

Materials for a 6-foot privacy fence

The initial 100 ft straight run uses 8 ft maximum post spacing and three rails per section: 14 posts, 39 rails, and 219 pickets with 5.5 in faces and no gaps. Run length excludes gate openings.

Fence lumber, level, and measuring tools staged outdoors

Start with your measurements

Size up your project

Example values are filled in. Replace them with your project measurements.

One straight run with no corners. Gate openings are excluded from length; extra gate or corner posts need a layout.

Before you order

  • Confirm fence layout, gate/corner posts and picket gaps.
  • Size concrete from the actual hole and post dimensions.

Quantities to confirm

Fence purchase sheet

Planning quantityAmount
Fence postsRound up run length / spacing, then add one end post.
14posts
Fence rails3 per section. Confirm rail length and size.
39rails
5.5 in pickets5.5 in faces, no gaps. Uses actual length including the partial end section.
219pickets
Post concrete allowanceAssumes two 50 lb bags per post. Verify actual hole volume and bag yield.
28bags
Gate hardware allowanceHardware only; extra gate-support posts are not included.
1sets
What this estimate assumes
  • One straight run, excluding gate openings. Corners, closed loops, picket gaps and extra cut waste are not inferred. Confirm footing design, product sizes and layout before ordering.
Name your project & add notes Optional

Includes your quantities, assumptions and space to record the supplier, confirmed quantity, quote and delivery. No account required.

How to check this list before buying

Why this example uses 219 pickets

The picket count covers the actual 100 ft length: 1,200 inches ÷ 5.5 inches, rounded up. It does not extend the last section to a full 8 ft or add an extra waste allowance.

Confirm post lengths, rail sizes, and hole dimensions from your design. The initial 28 concrete bags are a rough two-bags-per-post allowance, not a hole-volume calculation. Gate widths, extra gate-support posts, corners, and closed loops need separate planning.

Check local requirements and the utility-location process for your site before work begins. Save the chosen materials and open items in the purchase PDF.